The difference between developed and the rest of the world is of the choice made between being synchronized or not.
There are three stages of synchronization
Any type of synchronization is not possible without unity (willingness) among the elements meant to be synchronized.
Read more ...A new Health Information System is introduced to modernize health services provided by the IUB. Work is underway to register all employees and students of all campuses in the Health Information System.
For registration
18-04-2018
22-03-2018
21-07-2017
09-07-2017
Biometric Attendance: Biometric Attendance System is operational in Abbasia Campus on two locations. A biometric device is placed outside of Gothvi hall entrance and another device in Controller of Examination building. All administrative staff is directed to use these machines to show their presence in Abbasia Campus.
20-04-2018
Physical Network Repair/Maintenance Director IT visited Abu Bakr hostel to see the hostel and its internetwork infrastructure. Only two out of four Access Points were functional but nothing was operational due to a faulty switch in Rabia hostel.
It was decided to make all available Access Points functional on priority basis. It was also decided to immediately start developing a new decent infrastructure for networking in Abu-Bakr hostel.
Representative students from Abu-Bakr hostel were advised to contact directly to Director IT till the rectification of their internetwork issues.
05-04-2018
Physical Network Repair/Maintenance Due to a strong electrical surge in faculty of science building, much of the networking switches and telephone exchange developed faults. Many of the Smart University switches are also down. Provision of Internet facility is badly effected in BJC. Work is ongoing to assess the losses.
18-03-2018
Physical Network Repair/Maintenance work in Baghdad-ul-Jadeed Campus has started. It will help restore IUB Smart University wi-fi network.
Biometric Data Collection of employees of administrative departments is near to its completion.
Lists of Candidates for PM's Laptops Distribution Phase IV are on display for corrections.
21-07-2017
Wi-Fi for Staff Colony. Planning is underway to provide wi-fi access to staff colony in BJCampus. Directorate of IT stopped rectifying physical network problems within staff colony for the reason that existing network was unmanageable in its current form.
Smart University project; all remaining equipment arrived and getting installed.
09-07-2017
Smart University project; waiting for remaining equipment to arrive on site.
Internet Provision for BWN & RYK Campuses; Passive work will start soon depending on the availability of transport. Request for equipment got stuck due to lack of knowledge sharing between the administrative departments.
Wi-fi for Abbasia and Khawaja Fareed Campuses; waiting for Smart University to complete.